The brief was simple: our client needed to replace an eight part multipart access cover with removable beam in the roadway at the exit of the Qantas Domestic Terminal at Sydney Airport.
The work needed to be done quickly (and overnight) as they couldn’t interrupt the thousands of passengers arriving into Sydney through the airport each day. Mascot Engineering designed, certified and manufactured the cover solution which utilised our new and unique 1200mm clear opening access covers due to their large opening which allowed for us to achieve the desired span without the need for a beam.
The five part 1200mm wide trench run was supplied encased in concrete so the entire unit could simply be put in place with a crane saving valuable time on site for the contractor and ensured no delays for the airports arrivals.